Final Report and Supporting Documents for Task 24 (follow this link)
The IEA Wind Implementing Agreement (Wind IA) and the Hydropower Implementing
Agreement (Hydro IA) both have initiated annexes analyzing the potential
for integrating wind and hydropower systems. The primary purposes of
these annexes are to conduct cooperative research concerning the generation,
transmission, and economics of integrating wind and hydropower systems,
to understand the related social and environmental issues, and to consider
simulated water resource, reservoir and wind forecasting.
Participants from both annexes have come together in joint meetings to
discuss the collaboration between the annexes, research methods, case
studies, and results. In the spirit of cooperation between the two
annexes, participants presented updates from ongoing case studies related
to wind and hydropower integration, including research methods, assumptions,
and results.
Kickoff Meeting for Task 24 –Integration of Wind and
Hydropower Systems
February 22-23, 2005
Hoover Dam, Boulder City, Nevada USA
Kickoff Topical
Agenda
Kickoff Presentations
Keith Knitter,
Grant City PUD Flip Chart
Terje Gjengedal
Flip Chart
Operating Agent Representative Tom Acker made a progress report
on Task 24 to ExCo 56 in Lucerne, Switzerland.
Acker progress report to ExCo
R&D Meeting #1: Joint R&D
Meeting of the Wind/Hydro and Hydro/Wind Annexes
September 29 – October 2, 2005
Hotel Continental Park, Lucerne, Switzerland
R&D 1 Meeting Information
R&D1 Draft
Agenda
R&D 1 Meeting Synopsis and Summary
|
|