Recommended Practices

No. Area Ed. Year First Ed. Valid Status
1 Power Performance Testing 2   1982   Superseded by IEC 61400-12, Wind Power Perfomance
2 Estimation of Cost of Energy from WECS 2 1994 1983 yes  
3 Fatigue Load Characteristics 2 1990 1984 yes Part of IEC 61400-13 TS, Acoustic noise measurement techniques
4 Measurement of Noise Emission 3 1994   no Superseded by IEC 61400-11, Acoustic noise measurement techniqies
5 Electromagnetic Interference 1 1986   yes Also see CENELEC Draft prEN50373, Wind Turbines - Electromagnetic compatibility
6 Structural Safety 1 1988   no See also IEC 614000-1, ed 2
7 Quality of Power 1 1984     Superseded by IEC 614000-21, Measurement and assessment of power quality of grid connected wind turbines
8 Glossary of Terms 2 1993 1987   See also IEC 60050-415 International Electrotechnical vocabulary: Wind turbine generator systems
9 Lightning Protection 1 1997   yes See also IEC TR61400-24, Lighning protection for wind turbines
10 Noise Imission Measurement 1 1997   yes  
11 Wind Speed
Measurement
and use
of Cup Anemometers
1 1999   yes Document will be used by IEC 61400 MT 13, updating power performance measurement standard
11 2nd Printing of
Recommended Practice #11
2 Correction of 2nd Printing of Recommended Practice #11
12 Consumer Label for Small Wind Turbines 1 2011   yes  
13 Wind Energy Projects In Cold Climates   2012   yes  
14 Social Acceptence of Wind Energy Projects   2013      
15 Ground-Based Vertically-Profiling Remote Sensing For Wind Resource Assessment 1 2013      
16 Wind Integration Studies   2013   yes  

 